某大断面隧道穿越F1断层坍塌处治技术

Treatment Technology for Collapse of Large Cross-section Tunnel Crossing F1 Fault
下载PDF
导出
摘要 为解决大断面黄土片麻岩隧道穿越断层带坍塌后围岩破碎、无法自稳、处治困难等一系列问题,确保安全快速通过坍塌段,以厥湾隧道坍塌处治工程实例为依托,在隧道坍塌原因分析的基础上,对如何有效处治隧道断层带坍塌进行详细论述与总结,并给出了隧道坍塌段掘进施工的关键技术措施。工程实践证明,隧道处治效果良好,三台阶七步开挖法在穿越断层带施工合理可行,为类似隧道工程施工提供了借鉴。 In order to solve a series of problems such as the fragmentation of surrounding rock after the collapse of the large-section loess gneiss tunnel through fault zone,the inability to self-stabilize,and the difficulty of treatment,and to pass the collapse section safely,a detailed discussion on how to effectively treat the collapse of tunnel in fault zone was conducted based on the project of the Juewan tunnel collapse treatment and the analysis of the causes of tunnel collapse.Key technical measures for tunneling in collapse section were proposed.The engineering practice shows that the treatment effect of this tunnel is good,and the three-bench seven-step excavation method is feasible in fault zones,which provides a reference for the construction of similar tunnel projects.
作者 杨玢 YANG Bin(China Railway 19th Bureau Group Co.,Ltd.,Beijing 100176,China)
出处 《筑路机械与施工机械化》 2020年第4期33-36,共4页 Road Machinery & Construction Mechanization
基金 中交一公局第一工程有限公司企业级课题(KT2016-16)。
关键词 隧道工程 大断面 坍塌 处治 tunnel engineering large cross-section collapse treatment
  • 相关文献

参考文献10

二级参考文献69

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部