摘要
阳城煤矿3304工作面在通过顺面FD34(落差10m)断层期间,采用平推硬过、加固顶板、调整好上窜下滑、增加煤矸分装分运系统等措施,在保障矿井生产稳定的前提下,实现了快速推进和煤矸的分离,保证了煤质及经济效益,保障了工作面的安全回采。
During the period of passing through the FD34(drop 10m)fault along the face,the 3304 working face of Yangcheng Coal Mine adopts the measures of flat pushing and hard passing,strengthening the roof,adjusting the upward and downward movement,increasing the system of coal gangue separate loading and transportation,etc.under the premise of ensuring the stable production of the mine,it realizes the rapid promotion and separation of coal gangue,ensures the coal quality and economic benefits,and ensures the safe mining of the working face.
作者
马新伟
Ma Xin-wei(Yangcheng Coal Mine,Shandong Jining Mine Luneng Coal Power Co.,Ltd.,Shandong Wenshang 272502)
出处
《山东煤炭科技》
2020年第5期62-63,共2页
Shandong Coal Science and Technology
关键词
综采
断层
平推
fully mechanized mining
fault
flat pushing