掘进巷道快速过断层施工技术应用 被引量:6

Application of Rapid Crossing Fault Construction Technology in Tunneling Roadway
下载PDF
导出
摘要 基于四候煤矿3108回风顺槽过F3断层期间,顶板出现严重破碎、下沉现象,提出了俯斜台阶法施工工艺,并对断层破碎带顶板采取MF-2型化学材料注浆加固以及"钢筋锚索网+U29梯形棚"联合支护措施。支护效果检验结果表明,联合支护有效控制了断层破碎区顶板下沉、破碎现象,保证了巷道顶板稳定性。 Based on the fact that 3108 return air in Sihou Coal Mine passes through F3 fault and the roof is seriously broken and sunk,the construction technology of inclined bench method is put forward,and MF-2 chemical material grouting reinforcement and"reinforced anchor cable net+U29 trapezoid shed"combined support measures are adopted for the roof of fault fracture zone.The test results of support effect show that the combined support can effectively control the roof subsidence and breakage in the fault fracture area,and ensure the roof stability of the roadway.
作者 靳勇强 Jin Yong-qiang(Yangcheng Sihou Coal Industry Co.,Ltd.,Shanxi Coal Transportation and Marketing Group,Shanxi Jincheng 048100)
出处 《山东煤炭科技》 2020年第5期79-80,83,91,共4页 Shandong Coal Science and Technology
关键词 掘进 断层 加固 支护 tunneling fault reinforcement support
  • 相关文献

参考文献5

二级参考文献25

共引文献20

同被引文献25

引证文献6

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部