摘要
根据南方基地二期项目在水蓄冷项目建设模式,积极探索实施策略,以实现项目规划的整体目标。通过建设实践,本项目从专业设计模块化施工转变为一体化施工,最终提升了蓄冷效果。
According to the construction model of the second phase of South Base in the water storage project, this research actively explored implementation strategies to achieve the overall goal of the project. Through construction practice, this project changed from professional design modular construction to integrated construction, which ultimately improved the cool storage effect.
出处
《科技创新与应用》
2020年第17期68-69,共2页
Technology Innovation and Application
关键词
水蓄冷
建设模式
实践
water storage
construction model
practice