摘要
在天津周大福金融中心超高层建筑机电安装工程中,实现多专业协同工作、管线综合排布、可视化施工协调、二次结构预留预埋等方面应用BIM技术解决了超高层建筑机电安装工程中协调任务重、施工难度大等问题.
In the super high-rise building electromechanical installation project of Tianjin Chow Tai Fook Financial Center,the implementation of multi-disciplinary collaborative work,comprehensive pipeline arrangement,visual construction coordination,secondary structure reservation and embedding has solved the coordination of super high-rise building electromechanical installation engineering problems such as heavy tasks and difficult construction.
作者
张亚玲
黄联盟
王跃飞
ZHANG Ya-ling;HUANG Lian-meng;WANG Yue-fei(China Construction Eighth Engineering Division Co.,Ltd.,(Huabei),300450,Tianjin,China)
出处
《建筑技术》
2020年第5期589-591,共3页
Architecture Technology
基金
国家自然科学基金资助项目(51377044)。
关键词
超高层建筑
建筑信息模型
机电安装
super high-rise building
BIM
electromechanical installation