通过对现有污水处理工艺分析,找出污水处理场出水水质不能达标原因,通过对高密度沉淀池改造,使污水处理场出水可以稳定达到排放标准,同时降低运行费用。
Through the analysis of the existing sewage treatment process,the reason why the effluent quality of the sewage treatment plant can not reach the standard is found out.Through the reconstruction of the high-density sedimentation tank,the effluent of the sewage treatment plant can reach the discharge standard stably,and the operation cost is reduced at the same time.
作者
方球国
FANG Qiu-guo(Hunan Construction Engineering Group Design&Research Institute Co.,Ltd.,Changsha 410000,China)
出处
《价值工程》
2020年第15期180-181,共2页
Value Engineering
关键词
高密度沉淀池
改造
污水处理场
high-density sedimentation tank
reconstruction
sewage treatment plant