摘要
根据全面风险管理的理论,以姚江堤防加固工程鄞州段项目为例,采用故障树分析法,分析工程项目全面风险管理的主要影响因素,利用布尔代数化简法求出系统的最小割集。
According to the theory of total risk management, taking the Yinzhou section of Yaojiang dike reinforcement project as an example, fault tree analysis method is used to analyze the main influencing factors of total risk management of the project, and the minimum cut set of the system is obtained by Boolean algebra simplification method.
出处
《中国建材科技》
2020年第2期63-65,共3页
China Building Materials Science & Technology
基金
浙江省水利厅2019年一般课题(RC19107)。
关键词
风险管理
故障树
最小割集
risk management
fault tree
minimum cut set