摘要
该文依托某尾矿库1km排洪隧洞勘察工程,对硐室顶板、侧壁、底板、内部围岩强度及完整性进行无损测试,并采用数值分析方法,计算隧洞衬砌、锚杆结构支撑受力情况,反推已建构件极限受力能力及变形曲线,判断排洪隧洞稳定性状态,为尾矿库安全生产及类似隧洞勘察评价提供参考。
In this paper,based on the survey project of 1 km flood discharge tunnel of a tailings reservoir,the nondestructive detection of strength and integrity of surrounding rock in chamber roof,side wall,bottom plate and inside are carried out.The numerical analysis method is used to calculate the stress condition of tunnel lining and anchor bolt structure support,the ultimate stress capacity and deformation curve of the constructed parts are deduced,the stability state of flood discharge tunnel is judged.And it provides reference for the safe production of tailings reservoir and for the survey and evaluation of similar tunnel.
作者
王永增
代俊杰
孟磊磊
张伟
李天龙
Wang Yongzeng;Dai Junjie;Meng Leilei;Zhang Wei;Li Tianlong(Anshan Iron and Steel Group Mining,Qidashan Mine Co.,Ltd.;Anshan Iron and Steel Group Mining,Guanbaoshan Mining Co.,Ltd.;Anshan Iron and Steel Group Mining,Production Management Department;Zhongkan Metallurgical Geotechnical Investigation and Design&Research Institute Co.,Ltd.)
出处
《勘察科学技术》
2020年第1期33-39,共7页
Site Investigation Science and Technology
关键词
排洪隧洞
无损探测
数值分析
破坏判别准则
flood discharge tunnel
nondestructive detection
numerical analysis
failure criterion