期刊文献+

郁江“2018.08”洪水预报浅析

Analysis of forecast of 2018.08 flood on Yujiang River
下载PDF
导出
摘要 以西江右岸1级支流郁江南宁(三)水文站"2018.08"暴雨洪水为例,分析探讨采用回归方程法和合成流量法进行洪水预报的综合应用,为持续强降雨影响下受水利工程调蓄影响河段的洪水预报工作提供技术参考。 Nanning Ⅲ Hydrological Station is located on Yujiang River, the grade 1 tributary of Xijiang River. Taking the rainstorm flood occurred in August of 2018 and recorded by this station as example, the author discussed the comprehensive application of regression equation and compound flow method in flood forecast, in order to provide technical reference for the flood forecast in river sections subject to influence of continuous heavy rainfall as well as regulation and storage of water control project.
作者 李川琳 LI Chuan-lin(Hydrology Center of Nanning City,Nanning 530001,China)
出处 《广西水利水电》 2020年第2期42-46,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 洪水预报 回归方程 合成流量 水利工程调蓄影响 郁江 Flood forecast regression equation compound flow regulation and storage influence of water control project Yujiang River
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部