对加氢站的规划参考依据与发展路线进行探讨。总结加氢站规划阶段可供参考的标准规范,归纳我国已建加氢站用地面积,为今后的规划提供参考依据。加氢站发展路线分为近期(2019—2022年,应用示范期)、中期(2023—2035年,快速发展期)、远期(2036—2050年,成熟完善期)。近期,以加氢站示范项目为主,中远期将逐步实施加氢站的商业化。
The planning reference basis and development route of hydrogen refueling stations are discussed.The standard specifications that can be referenced in the planning stage of hydrogen refueling stations are summarized,and the land area of hydrogen refueling stations that have been built in China is summed up to provide reference basis for future planning.The development route of the hydrogen refueling stations is divided into the recent term(2019 to 2022,application demonstration period),the medium term(2023 to 2035,rapid development period)and the long term(2036 to 2050,mature and perfect period).In the recent term,the hydrogen refueling stations demonstration projects will be the mainstay,and the commercialization of hydrogen refueling stations will be gradually implemented in the medium and long terms.
出处
《煤气与热力》
2020年第2期J0020-J0023,J0045,共5页
Gas & Heat
关键词
加氢站
城市规划
氢燃料电池汽车
用地面积
hydrogen refueling station
urban planning
hydrogen fuel cell vehicle
land area