期刊文献+

净水厂中低压无功补偿的相关参数计算

Calculation of Relevant Parameters of Low Voltage Reactive Power Compensation in Water Plant
下载PDF
导出
摘要 现代净水厂中普遍采用电容电抗器组的形式在低压侧进行集中补偿。工程设计中常常忽略串联电抗器及电容器实际运行电压的计算,将电容电抗器组的额定容量作为实际输出容量,导致补偿后的功率因数不满足国家、地区标准的要求。针对串联电抗器及电容器额定电压的选择,对实际无功输出容量产生的影响进行分析,可为实际工程设计提供参考。 In modern water plants,the capacitor reactor bank is widely used for centralized compensation at the low voltage side.In engineering design,the calculation of series reactor and actual operating voltage of capacitor is often ignored,and the rated capacity of capacitor reactor bank is taken as the actual output capacity,resulting in the power factor after compensation not meeting the national or regional requirements.The influence of series reactor and rated voltage selection of capacitor on actual output capacity was analyzed.It can provide references for actual engineering design.
作者 林林 LIN Lin(Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,Shanghai 200092,China)
出处 《现代建筑电气》 2020年第4期53-56,共4页 Modern Architecture Electric
关键词 净水厂 电容电抗器组 无功补偿 功率因数 water plant capacitor reactor bank reactive power compensation power factor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部