摘要
江坪河面板堆石坝坝高219 m,属200 m级以上高面板坝,由于其特殊的建设历程,且工程蓄水后,堆石体还有较长一段时间的变形过程,面板承压水头大,面板及止水系统会遭到一定程度的破坏,从而影响面板的防渗效果。为此,在一定水头下的面板区域分别采用了PVC加强防渗、水泥基结晶涂料防渗及周边缝自愈料钢罩防渗措施。初期蓄水以来,通过监测数据初步反映这些加强防渗措施是可行且有效的。
The Jiangpinghe concrete face rockfill dam is 219 m high. Due to its special construction process, the rockfill body still has a long-term deformation process after the project is impounded and the face slab is under large water pressure, the face slab and the water stop system will be damaged to a certain extent, thereby the anti-seepage effect of the slab is affected. For these reasons, some strengthening anti-seepage measures are used in different area with different water head including PVC reinforced anti-seepage, cement-based crystalline paint anti-seepage and peripheral seam self-healing steel cover anti-seepage.Since the initial impoundment, the actual monitoring data shows that these strengthening anti-seepage measures are feasible and effective.
作者
徐建华
张长安
张繁
XU Jianhua;ZHANG Chang an;ZHANG Fan(Hubei Energy Group Loushui Hydropower Co.,Ltd.,Enshi 445801,Hubei,China)
出处
《水力发电》
北大核心
2020年第6期26-28,34,共4页
Water Power
关键词
面板
加强防渗
PVC防渗
水泥基防渗
钢罩防渗
江坪河面板堆石坝
face slab
strengthening anti-seepage
PVC anti-seepage
cement-based anti-seepage
steel cover anti-seepage
Jiangpinghe face rockfill dam