摘要
以礼河发电厂于2018年开始新水情系统改造,中心站机房由于条件所限,只能安放于原水情班办公室中建造的小隔间,空间狭小,技术协议中无相应的温湿度调节办法,机房两次意外停电后,空调未自启,造成机房温度过高。团队采用多种方法分析及处理该问题,使本次温湿度异常问题得到行之有效的解决,经过长期观察,小型机房能够在标准的温湿度运行,提高了系统的稳定性。
Yili Power Plant began the renovation of new hydrological system in 2018.Due to the limited conditions,the machine room of central station can only be placed in a small compartment constructed in the original hydrologic office,with a small space and no corresponding temperature and humidity adjustment method in the technical agreement.After two unexpected power outages in the machine room,the air conditioner did not turn on automatically,resulting in high temperature.The team used multiple methods to analyze and deal with the problem.This abnormal temperature and humidity problem has been effectively solved.After long-term observation,the small machine room can operate in the standard temperature and humidity,improving the stability of system.
作者
张胜
晏祥龙
柳灿
ZHANG Sheng;YAN Xiang-long;LIU Can(Yunnan Huadian Jinsha River Midstream Hydroelectric Development Co.,Ltd.Yili Power Plant,yunnan huize 654200,China)
出处
《云南水力发电》
2020年第3期87-91,共5页
Yunnan Water Power
关键词
新水情系统改造
小型机房
温湿度监测
空调自启动
transformation of new hydrological system
small machine room
temperature and humidity monitoring
air conditioning self-starting