期刊文献+

深圳地区深基坑开挖对邻近建筑物的影响分析 被引量:1

Analysis of impact of deep foundation pit excavation on adjacent buildings in Shenzhen
下载PDF
导出
摘要 以深圳市某深基坑工程为例,选择合适的土体本构模型,进行三维有限元分析,结合过程监测数据,分析了花岗岩残积土地区深基坑施工影响临近建筑物沉降的因素,结果表明,邻近建筑的不均匀沉降随基坑开挖施工步序的进行,总体上呈增大的趋势,所获结果可供同类工程参考。 Taking a deep foundation pit project in Shenzhen as an example,this paper selects a suitable soil constitutive model,conducts three-dimensional finite element analysis,and combines process monitoring data to analyze the factors affecting the settlement of adjacent buildings in the construction of deep foundation pits in granite residual soil areas. The results show that the uneven settlement of adjacent buildings increases with the progress of the foundation pit excavation. The results obtained can be used as a reference for similar projects.
作者 郭秋苹 张领帅 陈枝东 严树 李燕 刘峻滕 Guo Qiuping;Zhang Lingshuai;Chen Zhidong;Yan Shu;Li Yan;Liu Junteng(Shenzhen Hongyeji Geotechnical Technology Co.,Ltd.,Shenzhen 518063,China)
出处 《山西建筑》 2020年第12期93-95,共3页 Shanxi Architecture
关键词 深基坑 残积土 有限元 建筑物沉降 deep foundation pit residual soil finite element building settlement
  • 相关文献

参考文献10

二级参考文献58

共引文献629

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部