期刊文献+

增量法和总量法在洞桩法车站设计中的对比分析 被引量:1

ANALYSIS AND COMPARISON OF INCREMENTAL METHOD AND TOTAL METHOD IN THE DESIGN OF DRIFT-PILE SUBWAY STATION
下载PDF
导出
摘要 文中重点阐述在Sap84结构分析软件下,采用增量法和总量法进行工况组合的建模方法。通过对各施工阶段的受力转换分析,重点解决增量法建模时围岩、围护及主体结构的内力、位移及刚度增量的计算,并对增量法和总量法进行对比,为逆作法结构设计提供借鉴。 This article focuses on the method of modeling the combination of operating conditions using the incremental method and the sum quant method under the Sap84 structural analysis software.Through the analysis of the stress conversion at each construction stage,the increment of internal force,displacement,and stiffness of the enclosure,the main structure,and the surrounding rock were calculated.The comparison results of the two methods may provide a reference for the similar reverse design structure design.
作者 张瑞金 ZHANG Ruijin(Urban Rail Transit Design Institute,China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing 102600,China)
出处 《低温建筑技术》 2020年第4期138-140,150,共4页 Low Temperature Architecture Technology
关键词 洞桩法 逆作法 增量法 总量法 drift-pile method reverse method incremental method sum quant method
  • 相关文献

参考文献2

二级参考文献7

  • 1GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 2GB50010-2010,混凝土结构设计规范[s].北京:中国建筑工业出版社.2010.
  • 3JGJ120-99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999
  • 4YB9258-97建筑基坑工程技术规范[S].北京:冶金工业出版社,1997.17-26.
  • 5北京城建设计研究总院有限责任公司.合肥市轨道交通1号线大东门站初步设计图C版[G],北京,2012.
  • 6北京城建勘测设计研究院有限责任公司.合肥市轨道交通1号线一期工程大东门站岩土工程勘察报告[R].北京,2010.
  • 7王元湘.地下铁道深基坑工程围护结构的计算[J].世界隧道,1998(2):1-10. 被引量:6

共引文献10

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部