期刊文献+

基于IE思想的U型装配线生产效率改善研究 被引量:2

Study on production dffciency improvement of U-shaped assembly line based on IE idea
下载PDF
导出
摘要 应用仿真分析以及工业工程方法对有合作的自由节拍装配线生产效率进行了改善研究。对装配线的运作现状进行了仿真,从平衡率和产量两个角度,分析了装配线运作中存在的不足以及成因;在上述分析的基础上,对工人的合作策略进行了局部调整,对瓶颈工位进行了作业测定,针对作业中存在的问题,通过方法研究对作业方法进行改善,并再次通过作业测定验证作业方法改善的效果;通过仿真验证了装配线生产效率改善措施的总体效果。研究表明:通过合作策略以及瓶颈工位作业方法的改善,能够以较小的代价提高装配线的生产效率。 The production efficiency of cooperative paced assembly line was improved through simulation analysis and industrial engineering methods.The operation status of assembly line was simulated,and the shortcomings and causes in assembly line operation were analyzed from the perspective of balance rate and output.On the basis of above analysis,the cooperation strategy of workers was partly adjusted,and the work measurement was proceeded with the bottleneck workstation.The working methods were improved according to the measurement results,and the improvement effect of working methods was validated by the work measurement again.The overall effect of production efficiency improvement measures of this assembly line was verified by simulation.The results show that through the improvement of cooperation strategy and working methods in bottleneck station,the production efficiency of assembly line can be im proved at a lower cost.
作者 曹阳华 康秀翠 姜春英 CAO Yanghua;KANG Xiucui;JIANG Chunying(School of Economics and Management,Shenyang Aerospace University,Shenyang 110136,CHN;AECC Shenyang Liming Aero-engine Co.,Ltd.,Shenyang 110043,CHN;School of Mechanical Engineering,Shenyang Aerospace University,Shenyang 110136,CHN)
出处 《制造技术与机床》 北大核心 2020年第6期172-177,共6页 Manufacturing Technology & Machine Tool
基金 辽宁省自然科学基金(2019-ZD-0245) 辽宁省教育厅基金(L201620)。
关键词 U型装配线 仿真 改善 方法研究 作业测定 U-shaped assembly line sim ulation improvement methods research work measurement
  • 相关文献

参考文献5

二级参考文献36

  • 1陈亚青,孙宏.进近管制员工作进程分类及工作负荷研究[J].中国安全科学学报,2006,16(2):65-68. 被引量:37
  • 2张力,王以群,邓志良.复杂人——机系统中的人因失误[J].中国安全科学学报,1996,6(6):35-38. 被引量:78
  • 3Miltenburg G J , Wijngaard J. The U-line BalancingProblem [J]. Management Science, 1994 . 40 ( 10 ):1378-1388.
  • 4Sparling D, Miltenburg J. The Mixed-model U-lineBalancing Problem[J]. International Journal of Pro-duction Research, 1998,36(2) :485-501.
  • 5Scholl A, Klein R. ULINO: Optimally BalancingUshaped JIT Assembly Lines [J]. InternationalJournal of Production Research,1999,37 (4) : 721-736.
  • 6Kim Y K,Kim S J,Kim J Y. Balancing and Sequen-cing Mixed-model U-lines with a Co - evolutionaryAlgorithm [J ]. Production Planning and Control,2000,11(8)-754-764.
  • 7Miltenburg J. Balancing and Scheduling Mixed-mod-el U - shaped Production Lines [J]. InternationalJournal of Flexible Manufacturing Systems,2002,14(2):119-151.
  • 8Urban T L,Chiang W C. An Optimal Piecewise-lin*ear Program for the U-line Balancing Problem withStochastic Task Times[J]. European Journal o. Op-erational Research,2006,168(3) :771-782.
  • 9Kara Y,Paksoy T,Chang C 丁. Binary Fuzzy GoalProgramming Approach to Single Model Straightand U-shaped Assembly Line Balancing[J]. Europe-an Journal of Operational Research, 2009,195 (2):335-347.
  • 10Reakook H, Hiroshi K. A Multi - decision GeneticApproach for Workload Balancing of Mixed-modelU-shaped Assembly Line Systems [J]. InternationalJournal of Production Research,2009 ,47(14) :3797-3822.

共引文献26

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部