随着某市人口的不断增多,污水处理规模日益增大,某生活污水处理厂现有的规模已不能满足污水量的增加,将进行1×10^5t扩建工程实施及调试。完成前期施工后,于18年11-12月份进行各项调试工作。在调试内容中工艺调控占主导地位,对于后期稳定运行提供基础性支撑作用,同时对以后的新建、扩建生活污水处理厂的试运行科学管理有着较强的借鉴意义和现实指导意义。
With the increasing population of a city and the increasing scale of sewage treatment,the existing scale of a domestic sewage treatment plant can no longer meet the increase of sewage volume,and 100000 tons expansion project will be implemented and commissioned.After the completion of the preliminary construction,the commissioning work will be carried out from November to December.In the commissioning content,process control plays a leading role,which provides basic support for the later stable operation,and has strong reference significance and practical guidance significance for the later scientific management of the trial operation of the new and expanded domestic sewage treatment plant.
作者
王凯
Wang Kai(Everbright Water(Ji’nan)Co.,Ltd.,Ji’nan Shandong 250000,China)
出处
《环境与发展》
2020年第5期86-87,共2页
Environment & Development
关键词
生活污水处理
扩建工程
工艺调试
Domestic sewage treatment
Expansion project
Process commissioning