摘要
文章结合百色市体育中心二期项目钢结构施工,对现浇钢筋桁架楼承板施工技术进行介绍。针对钢筋桁架楼承板的预拼装、楼承板铺设连接、栓钉定位焊接、钢筋绑扎等主要施工步骤,结合工程实际阐述了具体的质量控制措施,在实施后取得了良好的经济效益和社会效益,可供相关工程参考。
Combined with the construction of steel structure of the second phase project of Baise Sports Center,the construction technology of cast-in-place steel truss floor bearing slab is introduced.In view of the main construction steps such as pre-assembly of steel truss floor slab,laying connection of floor slab,pin positioning welding,steel bar binding,etc.,the concrete quality control measures are expounded in combination with engineering practice,and good economic and social benefits are obtained after implementation,which can be a reference for relevant engineering projects.
作者
黄志
徐均纪
班幸存
Huang Zhi;Xu Junji;Ban Xingcun(Guangxi Construction Engineering Group No.1Construction Engineering Co.,Ltd.,Nanning Guangxi 530001,China)
出处
《城市建筑》
2020年第12期149-150,共2页
Urbanism and Architecture
关键词
现浇
钢筋桁架楼承板
施工技术
cast-in-place
steel-bar truss deck
construction technology