3Campbell D J.User's Guide for PRISIM A T Arkansas Nuclear One-Unit 1[M].Volume 1:Program for Inspectors.NUREG/CR25021,Jan,1988.
4Gordon R.Moir On-line Use of PSA for Risk-Based Configuration Control,IAEA Technical[A].Committee Meeting on "Procedures for Use of PSA for Optimizing NPP Operational Limit s and Conditions"[C].Barcelona,Spain,Sep,1993.
5Probabilistic Risk Assessment of the Space Shuttle,A Study of the Potent ial of Losing the Vehicle During Nominal Operat ion[R].(NASA 2CR2197808).New York:Science Application International Corporation,Advanced Technology Division.28 February,1995.
6Hazard Analysis and Safety Risk Assessment Methods and Procedures (ESA PSS2012403)[R].1994.ESA;
7Samanta P K,Kim I S.Handbook of Methods for Risk -Based Analyses of Technical Specifications[M].NUREG/CR26141,Dec.1994.
8Xue Dazhi,Xu Yaowu.The modeling approach for a real-time risk management system[A].International Conference on "Probabilistic Safety Assessment Met hodology and Applications "[C].PSA'95,Seoul,Korea,Nov.26230,1995.