摘要
新冠肺炎疫情防控期间,铁路工程总承包单位在工期和年度投资等多重压力下,必须抓好疫情防控工作,加快推进全线复工复产。工程总承包单位需要建立完善的疫情防控和复工复产领导机构,加强与地方各级政府的沟通协调,获得沿线属地政府的支持,并制定切实可行的疫情防控和复工复产工作方案。严格执行落实疫情防控“五定”措施和复工复产“六个到位”要求,并建立完善的考核和激励措施,才能同时抓好疫情防控和复工复产工作。
During the COVID-19 outbreak prevention and control period,the railway engineering EPC project department must take good measures to prevent and control the epidemic and accelerate the resumption of the whole line of production under the multiple pressures of construction period and annual investment.The EPC project department needs to establish a perfect leading organization for epidemic prevention and control and resumption of production,strengthen communication and coordination with local governments at all levels,obtain support from local governments along the line,and formulate feasible work plans for epidemic prevention and control and resumption of production.Only by strictly implementing the"five fixed"measures for epidemic prevention and control and the"six in place"requirements for resumption of production,and establishing perfect assessment and incentive measures,can we do well in epidemic prevention and control and resumption of work and production at the same time.
作者
周世禄
ZHOU Shi-lu(China Railway Design Corporation,Tianjin 300308,China)
出处
《中小企业管理与科技》
2020年第9期94-95,共2页
Management & Technology of SME
关键词
新型冠状病毒肺炎
工程总承包单位
疫情防控
复工复产
COVID-19
EPC project department
epidemic prevention and control
resumption of work and production