期刊文献+

装配式建筑预制构件钢材采购成本优化研究 被引量:5

Research on Optimization of Steel Procurement Cost for Prefabricated Building Components
下载PDF
导出
摘要 钢材费用在装配式建筑预制构件材料成本中最高占比超过51%,是进行采购成本优化的关键部分。本文考虑钢材市场价格波动的影响,研究应用ABC-LSSVR方法,预测未来多期钢材价格;进而以采购成本最小化为目的,考虑资金使用成本、生产连续性、价格波动等制约因素,建立钢材多期联合采购模型,应用粒子群算法对模型进行求解,得出最优的钢材采购策略,从而降低采购成本。实证分析表明:对比目前业内现行的钢材采购方案,应用优化后的采购方案,使钢材单位采购成本节约了34.21元/吨。 The cost of steel accounts for more than 50%of the prefabricated building materials cost,which is a key part of the procurement cost optimization of the prefabricated component supplier.This article considers the impact of steel market price fluctuations,researches and applies the ABC-LSSVR method to predict the future multi-period steel prices;and further aims at minimizing procurement costs,taking into account constraints such as capital use costs,production continuity,and price fluctuations.Combined purchasing model,the particle swarm algorithm is used to solve the model,and a scientific steel purchasing strategy is obtained,thereby reducing the procurement cost.An empirical analysis of a large-scale prefabricated component production base in W City shows that compared with the current procurement schemes in the industry produce better economic benefits.
作者 陈伟 谢欣 王朝晖 CHEN Wei;XIE Xin;WANG Zhaohui(School of Civil Engineering and Architecture,Wuhan University of Technology,Wuhan 430070,China;Wuhan Sanmu Hesen Construction Co.,Ltd.Wuhan 430061,China)
出处 《建筑经济》 北大核心 2020年第6期92-99,共8页 Construction Economy
基金 武汉市城建科研项目“装配式建筑工程项目管理规范研究”(武城建[2018]14号)。
关键词 装配式预制构件 钢材采购成本 价格预测 ABC-LSSVR方法 策略优化 prefabricated prefabricated component steel purchase cost price prediction ABC-LSSVR method strategy optimization
  • 相关文献

参考文献6

二级参考文献56

  • 1虞平.国内锆英砂市场价格影响因素分析[J].稀有金属快报,2007,26(1):79-82. 被引量:4
  • 2刘国莉,唐立新,张明.钢铁原料库存问题研究[J].东北大学学报(自然科学版),2007,28(2):172-175. 被引量:14
  • 3吴桥.现货价格波动下原材料最优采购决策研究[D].浙江大学,2012.
  • 4Harris W. How many parts to make at once[J]. The Magazine of Management, 1913, 10(2): 135-136.
  • 5Bertazzi L. Rounding off the optimal solution of the economic lot size problem[J]. Int J of Production Economics, 2003, 81/82: 385-392.
  • 6Hariga M, Haouari M. An EOQ lot sizing model with random supplier capacity[J]. Int J of ProductionEconomics, 1999, 58(1): 39-47.
  • 7Gao Z, Tang L X. A multi-objective model for purchasing of bulk raw materials of a large-scale integrated steel plant[J]. Int J of Production Economics, 2003, 83(3): 325- 334.
  • 8Tang L X, Liu G L, Liu J. Raw material inventory solution in iron and steel industry using Lagrangian relaxation[J]. J of the Operational Research Society, 2008, 59(1): 44-53.
  • 9Kingsman B G. Purchasing raw materials with uncertain fluctuating prices[J]. European J of Operational Research,1986, 25(3): 358-372.
  • 10Arnold J, Minner S, Eidarn B. Raw material procurement with fluctuating prices[J]. Int J of Production Economics, 2009, 121(2): 353-364.

共引文献183

同被引文献54

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部