期刊文献+

自制轨道式移动脚手架在大空间复杂曲面吊顶装饰工程中的应用 被引量:2

Application of Self-made Track Type Mobile Scaffold in Large Space and Complex Curved Ceiling Decoration Engineering
下载PDF
导出
摘要 根据宁波奥体中心游泳馆项目游泳池上部铝圆通曲面吊顶的施工实践,利用由支撑架体、轨道、施加预应力的转换层和施工平台结构组成的自制轨道式移动脚手架体系,解决了非平面基础上大空间复杂曲面吊顶的安装难题,在降低成本的同时,减少了吊顶下部对其他工作面的影响,加快了整体施工进度。总结的关键技术为类似游泳馆等大空间吊顶装饰工程的施工积累了经验。 According to the construction practice of aluminum circular curved ceiling on the upper part of swimming pool of Ningbo Olympic Sports Center Natatorium project,the installation problem of large space complex curved ceiling on non-plane foundation is solved by the self-made rail type mobile scaffold system consisting of support frame,track,prestressed transfer layer and construction platform structure.At the same time of cost reduction,the impact of the lower part of the ceiling on other working faces is reduced,and the overall construction progress is accelerated.The key technologies summarized accumulate experience for the construction of similar natatorium and other large space ceiling decoration project.
作者 蔡岳松 许必强 潘新跃 CAI Yuesong;XU Biqiang;PAN Xinyue(Ningbo Jiangong Jianle Engineering Co.,Ltd.,Ningbo,Zhejiang 315020,China)
出处 《建筑施工》 2020年第5期755-757,共3页 Building Construction
关键词 自制轨道 移动脚手架 施加预应力的转换层 非平面基础 大空间曲面吊顶 self-made track mobile scaffold prestressed transter layer non-plane foundation large space curved ceiling
  • 相关文献

参考文献4

二级参考文献18

  • 1梁培新,郭正兴.扣件式钢管移动脚手架施工的关键技术[J].施工技术,2007,36(2):38-39. 被引量:3
  • 2蓝建勋,许艺辉,齐晓剑,李朗.CRAB系列模块脚手架在北京首都国际机场T3B新航站楼超大空间超大跨施工中的应用创新[J].建筑施工,2007,29(5):349-353. 被引量:3
  • 3BS EN 12811-1:2003 Temporary works equipment-patti: scaffoldsperformance requirements and general design[ S].
  • 4BS EN 12811-2:2004 Temporary works equipment-part2: information on material[ S].
  • 5BS EN 12811-3:2002 Temporary works equipment-part3: load test [S].
  • 6BS EN 12810-1:2003 Facade scaffolds made of prefabricated components -part1 : products specification[ S].
  • 7BS EN 12810-2:2003 Facade scaffolds made of prefabricated components -part2: particular methods of structural design[S].
  • 8JGJ130-2011,建筑施工扣件式钢管脚手架安全技术规范[s].
  • 9UK National Standards Institute.BS EN 12811-1:2003 Temporary WorksEquipment-part 1:Scaffolds-performance Requirements and General Design[S].UK:UK National Standards Institute,2003.
  • 10北京钢铁设计研究总院.GB50017-2003钢结构设计规范[S].北京:中国计划出版社.2003.

共引文献9

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...