对常用深水基础施工围堰形式进行分析,比较双壁钢围堰、锁口钢管桩围堰、钢板桩围堰方案的优缺点及其适用特点。依托五峰山长江大桥3号主墩,在地质差异不均匀、不平衡土压力大、抽水水头大、平面尺寸大的情况下,详细介绍哑铃形双壁钢围堰的设计思路、设计要点、结构构造和计算;根据围堰重量大、尺寸大、加工质量要求高等特点,详细介绍围堰制作与运输、拼装与下沉、封底与抽水施工过程,为类似工程承台顺利施工提供设计与施工借鉴。
The common forms of deep water foundation cofferdam construction were analyzed,the advantages and disadvantages of double wall steel cofferdam,lock steel pipe pile cofferdam and steel plate pile cofferdam were compared.Relying on the No.3 main pier of the Wufengshan Bridge,in the case of uneven geology,large unbalanced earth pressure,large pumping head and large plane size,we introduced in detail the design idea,main points of design,structure and calculation of dumbbell type double-wall steel cofferdam;according to the characteristics of large weight,large size and high processing quality requirements of the cofferdam,we introduced in detail the construction process of cofferdam making and transporting,assembling and sinking,bottom sealing and pumping,which provides reference for the design and construction of pile caps of similar projects.
作者
黄修平
王孝兵
郭志伟
刘鸽
HUANG Xiu-ping;WANG Xiao-bing;GUO Zhi-wei;LIU Ge(CCCC Wuhan Harbor Engineering Design&Research Institute Co.,Ltd.,Wuhan,Hubei 430040,China;Hubei Key Laboratory of Advanced Materials&Reinforcement Technology Research for Marine Environment Structures,Wuhan,Hubei 430040,China)
出处
《中国港湾建设》
2020年第6期25-29,共5页
China Harbour Engineering
关键词
深水
哑铃形
双壁
钢围堰
不平衡土压力
分节拼装
deep water
dumbbell type
double wall
steel cofferdam
unbalanced earth pressure
segmented assembly