摘要 根据《混凝土面板堆石坝设计规范》(SL 228-2013)中3.1.6条第4点规定,黔中水利枢纽枢纽一期工程—平寨水库坝高150 m,需增设放空设施,对该工程低部位放空设施方案进行比选,最终推荐采用右岸导流洞改建阀门控制放空方案。结论可对类似工程提供参考。 According to the Article 3.1.6 point 4 of the“Specifications for Design of Concrete Face Rockfill Dam”(SL 228-2013),the Pingzhai Reservoir(dam height 150m)of the first phase of the Qianzhong Water Control Project needs additional venting facilities.Through the comparison and selection of the low-level venting facilities for the project,the final proposal is to add a valve control to rebuild the right bank diversion tunnel for venting.The conclusion can provide reference for similar projects.
作者 邵红艳 欧波 Shao Hongyan;Ou Bo(Guizhou Survey and Design Research Institute for Water Resources and Hydropower,Guiyang 550002,Guizhou)
出处 《陕西水利》 2020年第5期161-162,167,共3页 Shaanxi Water Resources
关键词 增设低部位放空设施 新老规范交接 黔中水利枢纽一期工程 Adding low-level venting facilities handover of new and old standards first-stage project of Qianzhong Water Control Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部