内蒙古某交流特高压站场地沉降的原因分析 被引量:2

Analysis of Design Reason for Site Settlement of a UHV AC Substation in Inner Mongolia
下载PDF
导出
摘要 文章通过分析内蒙古某交流特高压站场地沉降的原因,指出在内蒙风积砂和粉土地质条件下,防治机械潜蚀的措施。通过分析比较各种防水措施的效果,得出了在总平面布置确定,地基处理材料确定的情况下,采取防堵结合综合处理的方式才能达到理想的效果。 This thesis point out the methods of reducing the mechanical suffosion under the geological conditions of aeolian sand and silt at Inner Mongolia,throughput analysis site settlement of a UHV AC substation in Inner Mongolia.Through analysis and comparison the effect of various waterproof measures,we have come to a conclusion,under circumstances of certain general layout design and foundation treatment materials define,the combination of anti blocking and comprehensive treatment can achieve the desired results.
作者 许瑜 XU Yu(State Grid AC Engineering Construction Company,Beijing 100052,China)
出处 《电力勘测设计》 2020年第S01期31-36,共6页 Electric Power Survey & Design
关键词 地质条件 沉降 机械潜蚀 不透水层 geological conditions settlement mechanical suffosion confining layer
  • 相关文献

同被引文献23

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部