文章通过分析内蒙古某交流特高压站场地沉降的原因,指出在内蒙风积砂和粉土地质条件下,防治机械潜蚀的措施。通过分析比较各种防水措施的效果,得出了在总平面布置确定,地基处理材料确定的情况下,采取防堵结合综合处理的方式才能达到理想的效果。
This thesis point out the methods of reducing the mechanical suffosion under the geological conditions of aeolian sand and silt at Inner Mongolia,throughput analysis site settlement of a UHV AC substation in Inner Mongolia.Through analysis and comparison the effect of various waterproof measures,we have come to a conclusion,under circumstances of certain general layout design and foundation treatment materials define,the combination of anti blocking and comprehensive treatment can achieve the desired results.
作者
许瑜
XU Yu(State Grid AC Engineering Construction Company,Beijing 100052,China)
出处
《电力勘测设计》
2020年第S01期31-36,共6页
Electric Power Survey & Design
关键词
地质条件
沉降
机械潜蚀
不透水层
geological conditions
settlement
mechanical suffosion
confining layer