摘要
Introduction The Myanmar-China Oil and Gas Pipeline Project is the first large-scale oil and gas pipeline facility across the entire territory of Myanmar.It was successfully built into a quality,safe,environment-friendly pipeline facility by SPI and its partners in 8 years,based on 5 years of preparations,despite of harsh geological conditions(e.g.ocean,mountains,swamps,tidal flats,rivers or seismic zones),hot and rainy climate,and undeveloped social and economic conditions.