摘要 承德市某污水处理厂存在冬季低温反硝化效果差、可利用占地面积小等难点,扩建工程采用“预处理+改良A^2/O工艺+磁混高效沉淀+纤维转盘滤池”组合工艺。运行实践表明:该工艺运行稳定,出水水质满足GB 18918—2002《城镇污水处理厂污染物排放标准》一级A排放标准,与原有百乐克工艺相比,改良A^2/O工艺节省运行成本35.88%。 A sewage plant in Chengde had two difficulties poor performance of denitrification in the winter and insufficient useable space.To solve the problems,the expansion project adopted“Pretreatment+Modified A^2/O process+High rate clarifier process+Fiber rotary filter”combined process.The operational practice showed that the combined process works well and the effluent quality meets the first level A criteria in the GB 18918—2002 Discharge standard of pollutants for municipal water treatment plant.Comparing with the original Biolak technology,the modified A^2/O process saved 35.88%operating costs.
作者 谢丽清 贾彦武 唐行鹏 王明智 XIE Liqing;JIA Yanwu;TANG Xingpeng;WANG Mingzhi(North Engineering Design and Research International Limited,Shijiazhuang 050011,China;The Second Water Conservancy and Hydropower Survey&Design Institute of Hebei Province,Shijiazhuang 050021,China)
出处 《水科学与工程技术》 2020年第3期75-78,共4页 Water Sciences and Engineering Technology
关键词 A^2/O工艺 磁混高效沉淀 运行成本 modified A^2/O process high rate clarifier process operating cost
  • 相关文献

参考文献3

二级参考文献83

共引文献134

同被引文献58

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部