摘要 电厂在建设期间,对电气设备及其自动装置元器件组成,甚至是对整个电气系统进行调试都尤为关键。论文首先从一般检查及线路检查、绝缘性试验、控制单元调试、操作控制电路调试四个角度提出电气设备调试内容,然后从准备工作、单体调试、单回路调试、综合调试四个角度分析电厂建设中电气设备的调试技术流程,旨在为相关人士提供有价值的参考。 During the construction of the power plant,it is particularly important to debug the electrical equipment and its automatic components,and even the whole electrical system.First of all,the paper puts forward the content of the electrical equipment debugging from the general inspection and line inspection,insulation test,the control unit debugging,operation control circuit debugging,then analyzes the debugging technical process of electrical equipment in the construction of power plant from four perspectives,namely,preparation work,monomer debugging,single circuit debugging,and comprehensive debugging,so as to provide valuable reference for relevant people.
作者 张炎烽 ZHANG Yan-feng(Huazhong Electric Power Experimental Research Institute Co.,Ltd.,China Energy Engineering Group Co.,Ltd.,Changsha 410000,China)
出处 《中小企业管理与科技》 2020年第11期180-181,共2页 Management & Technology of SME
关键词 电厂建设 电气设备 调试技术 power plant construction electrical equipment debugging technology
  • 相关文献

参考文献2

二级参考文献4

共引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部