4Higgins A. Scheduling of railway maintenance activities and crews [ J ]. Journal of the Operational Research Society, 1998, 49 : 1026-1033.
5Vale C, Ribeiro I, Calada R. Integerprogramming to optimize tamping in railway tracks as preventive maintenance[J]. Journal of Transportation Engineering, 2012, 137(1) : 123-131.
6Miwa M. Mathematicalprogramming model analysis for the optimal track maintenance schedule [ R ]. Japan: Railway Technical Research Institute, 2002, 43 ( 3 ) : 131-136.
7Zhao J, Chan AHC, Burrow MPN. Reliabilityanalysis and maintenance decision for railway sleepers using track condition information [ J ]. Journal of the Operational Research Society, 2007, 58: 1047-1055.
8Zhao J, Chan AHC, Burrow MPN. Agenetic - algorithm-based approach for scheduling the renewal of railway track components [ J ]. Proceedings of the Institution of Mechanical Engineers Part F-Journal of Rail and Rapid Transit, 2009, 223: 533-541.
9Zhang T, Andrews J, Wang R. Optimal scheduling of track maintenance on a railway network [ J] Quality and Reliability Engineering International, 2012.
10Budai G, Huisman D, Dekker R. Scheduling-preventive railway maintenance activities [ J ]. Journal of the Operational Research Society, 2006, 57 ( 9 ): 1035-1044.