TBM掘进与钻孔灌浆同步施工技术研究与应用

Research and application of TBM tunneling and bored grouting construction technology
下载PDF
导出
摘要 近年来,TBM掘进已成为长隧洞施工技术的主要发展方向,但隧洞围岩固结灌浆无法与TBM掘进同步施工,成为影响项目直线工期的关键因素。文章就某市水源地引水隧洞成功实现钻孔灌浆与TBM掘进同步的施工技术进行分析、研究,为类似工程施工提供参考。 In recent years,TBM excavation has become the main development direction of long tunnel construction technology,but the consolidation and grouting of the surrounding rock of the tunnel cannot be synchronized with TBM excavation and has become a key factor affecting the straight-line construction period of the project.The article analyzes,the technology of successful construction of borehole grouting and TBM tunneling in a water source diversion tunnel in a city,and provides a reference for similar projects.
作者 景小青 JING Xiaoqing(Sinohydro Engineering NO.4 Bureau Co.,Ltd,Xining 810007,China)
出处 《中国高新科技》 2020年第8期70-72,共3页
关键词 TBM掘进 固结灌浆 同步施工 TBM tunneling consolidation grouting synchronous construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部