摘要
根据3个自动化主站系统的搬迁方案,从搬迁现状、搬迁需要具备的条件及根据现有技术设备制定的搬迁规划等方面进行对比后,对自动化系统机房的搬迁提出相应的建议。
According to the relocation plan of the three automation main station systems,this paper compares the status of relocation,relocation requirements and relocation planning based on existing technology and equipment,and puts forward corresponding suggestions for the relocation of the automation system room.
作者
韦煌
王亚
黄裕洋
罗锐
陈剑峰
韦佳祥
WEI Huang;WANG Ya;HUANG Yuyang;LUO Rui;CHEN Jianfeng;WEI Jiaxiang(Liuzhou Power Supply Bureauof Guangxi Power Grid Company,Liuzhou 545000,China;Electric Power Dispatch&Control Center of Guangxi Power Grid Company,Nanning 530000,China)
出处
《电工技术》
2020年第7期42-43,共2页
Electric Engineering
关键词
调度自动化系统
主站
搬迁
dispatching automation system
master station
relocation