期刊文献+

BIM技术在隧道工程进度管理中的应用 被引量:3

Application of BIM Technology in the Schedule Management ofTunnel Engineering
下载PDF
导出
摘要 以Mosman隧道为依托,为解决隧道施工过程中面临的模型动态调整需求和进度管理复杂多变等难题,针对隧道工程特点,通过分析总结整体设计原则和应用流程,提出参数化建模理念与实践。结合BIM4D技术,提出隧道工程进度管理模式,并研发相应的功能插件进行应用,实现动态模型与进度管理相结合,完成参数化掘进、进度分析、任务分派等特色应用,有效提升项目进度管理水平。 Based on the Mosman tunnel,this paper is aimed at the characteristics of tunnel engineering,through the analysis of the overall design principle and application process in tunnel engineering,puts forward the idea of parameterized automatic modeling in order to solve the problem of model dynamic adjustment and schedule management.This paper also proposes the schedule management of tunnel engineering,and develops corresponding function plugins based on BIM4D technology,which achieves the combination of dynamic model and schedule management.The schedule platform is applied to the demonstration project in parameterized modeling,schedule analysis and task assignment,which effectively enhances the management level of project schedule.
作者 张晓洋 ZHANG Xiaoyang(CBIM Beijing Co.,Ltd.,Beijing 100193,China)
出处 《施工技术》 CAS 2020年第9期100-103,共4页 Construction Technology
关键词 隧道工程 建筑信息模型 进度管理 参数化 工作分解结构 tunnels building information modeling(BIM) schedule management parameterization work breakdown structure(WBS)
  • 相关文献

参考文献13

二级参考文献96

共引文献446

同被引文献15

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部