摘要
郑万铁路引入郑州枢纽遇到一系列信号设计问题,比较复杂特殊的难点问题有C T C S-3级系统引入枢纽过渡开通解决方案以及场联分界对信号系统控制的影响,针对这两个问题进行详细介绍。
There is a series of signal design problems in introducing Zhengzhou-Wanzhou railway into zhengzhou hub.The complex and special diffi cult problems include the transition and opening solution of introducing CTCS-3 level system into the hub and the influence of connection line boundary between yards on signal system control.This paper introduces these two problems in detail.
作者
陈小梅
Chen Xiaomei(China Railway Siyuan Survey and Design Institute Group Co.,Ltd.,Wuhan 430063,China)
出处
《铁路通信信号工程技术》
2020年第6期14-19,43,共7页
Railway Signalling & Communication Engineering
关键词
枢纽
信号
难点
问题
hub
signal
diffi culty
problem