期刊文献+

试析灰土挤密桩处理湿陷性黄土

Treatment of collapsible loess by lime soil compaction pile
下载PDF
导出
摘要 随着我国城市化建设进程的不断推进,对于建筑工程的建设力度也在不断加强,在建筑工程施工过程中,会受到各方面因素的影响,从而使得工程建设过程受到了一定的阻碍,其中湿陷性黄土就是影响因素之一。现阶段通过采取灰土挤密桩的方式处理湿陷性黄土,能够利用其自身的优势提高建筑工程施工质量和效率,灰土挤密桩主要是对土体进行横向的挤密处理,从而能够提高被挤密土体的最大干密度,使其满足相应技术标准要求,最终促进建筑工程的施工进度。以灰土挤密桩为研究对象,对其处理湿陷性黄土进行了相应的分析。 with the continuous progress of urbanization construction in China,the construction of construction projects is also constantly strengthened.In the construction process of construction projects,it will be affected by various factors,so that the project construction process is hindered to a certain extent,among which collapsible loess is one of the influencing factors.At present,by using lime soil compaction pile to deal with collapsible loess,the construction quality and efficiency can be improved by using its own advantages.Lime soil compaction pile is mainly used for lateral compaction of soil mass,so as to improve the maximum dry density of the compacted soil mass,make it meet the requirements of the corresponding technical standards,and finally promote the construction progress of the construction project.In this paper,lime soil compaction pile is taken as the research object,and its treatment of collapsible loess is analyzed.
作者 张立林 Zhang Lilin(China Aviation Oil Co.,Ltd.Gansu Branch,Gansu Lanzhou 730000)
出处 《云南化工》 CAS 2020年第6期169-170,共2页 Yunnan Chemical Technology
关键词 灰土挤密桩 湿陷性黄土 处理 lime soil compaction pile collapsible loess treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部