停采线顶板预裂抑制采区巷道变形的研究和实践 被引量:1

Research and practice of roadway deformation of mining line roof pre-cracking
下载PDF
导出
摘要 为了抑制工作面采动影响,消除采区巷道采后变形过大,维护巷道的稳定性,通过分析巷道布置形式,工作面超前支撑压力分布规律,提出了通过切顶卸压技术来阻断超前支撑压力的传递路径,达到保护采区巷道的目的。介绍了切顶留巷技术的施工关键,并且对施工效果进行了分析,提出了切顶卸压对保护巷道的作用,以及在采用该技术应该注意的关键性问题。 In order to control the influence of working face mining,eliminate the excessive post-mining deformation of the mining area and maintain the stability of the alleyway,by analyzing the arrangement of the roadway and the distribution law of the advanced support pressure of the working face,it was proposed to block the transmission path of the advanced support pressure by cutting the top pressure relief technology to achieve the purpose of protecting the roadway of the mining area.The key to the construction of the top-retention alley technology was introduced,the construction effect was analyzed,and the role of top-retention pressure relief in protecting the alleyway was proposed,as well as the key issues noted of the technology.
作者 王进锋 张志美 Wang Jinfeng;Zhang Zhimei(Laomupo Mining Industry Corporation Ltd.,Jizhong Energy Xingtai Mining Group,Linfen 042403,China;Hebei Coal Science Research Institute,Xingtai 054000,China)
出处 《煤炭与化工》 CAS 2020年第5期5-8,共4页 Coal and Chemical Industry
关键词 采区巷道 超前支撑压力 切顶卸压 mining area roadway advanced support pressure cut-top pressure relief
  • 相关文献

参考文献3

二级参考文献20

  • 1徐则民,黄润秋,王士天.隧道的埋深划分[J].中国地质灾害与防治学报,2000,11(4):5-10. 被引量:53
  • 2张农,高明仕.煤巷高强预应力锚杆支护技术与应用[J].中国矿业大学学报,2004,33(5):524-527. 被引量:303
  • 3王金华.我国煤巷锚杆支护技术的新发展[J].煤炭学报,2007,32(2):113-118. 被引量:302
  • 4康红普,姜铁明,高富强.预应力在锚杆支护中的作用[J].煤炭学报,2007,32(7):680-685. 被引量:423
  • 5Sellers E J, Klerck E Modeling of the effect of discontinuities on the extent of the fracture zone surrounding deep tunnels[J]. Tunneling and Underground Space Technology, 2000, 15(4): 463 - 469.
  • 6Kidybinski A, Strata Control in Deep Mines[M]. Rotterdam: A.A.Balkema, 1990.
  • 7Fairhurst C. Deformation, yield, ruptureand stability of excavations at great depth[A]. In: Faorhurst C ed. Rock at Great Depth[C].Rotterdam: A.A. Balkema, 1990. 1 103 - 1 114.
  • 8Malan D F, Spottiswoode S M. Time-dependent fracture zone behavior and seismicity surrounding deep level stopping operations[A]. In: Gibowicz S J, Lasocki S ed. Rockbursts and Seismicity in Mines[C]. Rotterdam: A. A. Balkema, 1997. 173-177.
  • 9钱七虎.非线性岩石力学的新进展-深部岩体力学的若干问题[A].见:中国岩石力学与工程学会主编.第八次全国岩石力学与工程学术大会沦文集[C].北京:科学出版社,2004.10-17.
  • 10钱七虎.深部地下工空间开发中的关键科学问题[A]..第230次香山科学会议—深部地下空间开发中的基础研究关键技术问题[C].北京:[s.n.],2004..

共引文献405

同被引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部