期刊文献+

高速铁路桥梁装配式一体化施工技术研究 被引量:4

Research on Assembly and Integrated Construction Technology of Highspeed Railway Bridge
下载PDF
导出
摘要 结合新建京雄城际铁路固霸特大桥的施工经验,本文从套筒安装、钢筋及模板施工、混凝土浇筑、墩柱及墩帽安装等方面进行了介绍。同时,针对京雄城际高速铁路项目特点,研究了高速铁路桥梁装配式一体化预制拼装关键技术,为其他类似工程施工提供经验参考。 Combined with the construction experience of the newly built Beijing-Xiong'an Intercity Railway Guba Super Large Bridge,this paper introduced from the aspects of sleeve installation,steel bar and formwork construction,concrete pouring,pier column and pier cap installation.At the same time,according to the characteristics of the Beijing-Xiong'an intercity high-speed railway project,the key technologies of high-speed railway bridge assembly-type integrated prefabricated assembly were studied to provide experience reference for the construction of other similar projects.
作者 安宏科 程建红 AN Hongke;CHENG Jianhong(Shaanxi Railway Engineering Vocational and Technical College,Weinan Shaanxi 714000)
出处 《河南科技》 2020年第14期75-77,共3页 Henan Science and Technology
关键词 高铁桥梁 装配式桥墩 一体化施工 high-speed rail bridge fabricated pier integrated construction
  • 相关文献

参考文献3

二级参考文献10

共引文献12

同被引文献16

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部