复杂条件下大型钢箱梁分段安装技术研究 被引量:1

Research on Sectional Installation Technology of Large Steel Box Girder under Complex Conditions
下载PDF
导出
摘要 钢箱梁是大跨径桥梁常用的结构形式,因为钢材抗弯、抗扭性能好,钢箱梁可以做的比混凝土结构轻,外形可以更简洁、美观。S3公路先期实施段新建工程2标钢箱梁安装工程,包括1处45m单跨钢-砼简支叠合梁和2处43m+64m+43m三跨钢-砼变高度连续叠合梁。为了方便运输和安装,需要进行有效的结构拆分。厂内实施精度管控,确保钢结构的加工精度满足设计要求。施工场地狭长,横向规划河道多,跨路施工作业时,做好交通组织,对靠近轨道交通16号线的区域采取相应的保护措施,远离轨交保护区域。S3公路先期实施段新建工程为迪士尼配套工程,建设周期短,需结合下部结构施工进度、钢箱梁加工进度和业主交地情况,精细施工计划,做好进度管理。希望本文可以为类似工程提供相应技术参考。 Steel box girder is a commonly used structural form for large-span bridges.Because steel has good bending and torsion resistance,steel box girder can be made lighter than concrete structure,and the shape can be more concise and beautiful.The installation of 2 standard steel box girder for the new construction of the S3 highway in the early implementation period includes one 45m single-span steel-concrete simply supported composite beam and two 43m+64m+43m three-span steel-concrete variable-height continuous composite beams.In order to facilitate transportation and installation,an effective structural split is required.The factory implements precision control to ensure that the machining accuracy of the steel structure meets the design requirements.The construction site is long and narrow,and there are many horizontally planned rivers.During cross-road construction operations,the transportation organization should be well organized,and the corresponding protection measures should be taken for the area near the rail transit line 16 and away from the rail transit protection area.The new construction of the early implementation section of the S3 highway is a supporting project for Disney.The construction period is short.It is necessary to combine the construction progress of the substructure,the processing progress of the steel box girder and the land exchange situation of the owner.This article can provide corresponding technical reference for similar projects.
作者 陈毅 CHEN Yi(Shanghai Construction No.4(Group)Co.,Ltd.,Shanghai 201103,China)
出处 《价值工程》 2020年第17期173-178,共6页 Value Engineering
关键词 复杂条件 大型钢箱梁 分段拼装 complex conditions large steel box girder sectional installation
  • 相关文献

参考文献8

二级参考文献29

  • 1陈淮,杨磊,郭向荣.列车通过连续钢桁梁桥时的动力响应研究[J].郑州大学学报(理学版),2004,36(4):80-84. 被引量:5
  • 2CJJ2-2008,城市桥梁工程施工与质量验收规范[S].
  • 3TB10212--2009,铁路钢桥制造规范[S].
  • 4TB10002.2-2005,铁路桥梁钢结构设计规范[s].
  • 5JTG/TF50-2011,公路桥涵施工技术规范[S].
  • 6中铁大桥局股份有限公司设计分公司.枝城长江大桥铁路桥伸缩缝纵梁节点板维修加固施工图[z].武汉,2013.
  • 7湖北省公路工程咨询监理中心,宜昌市虹源检测有限公司.焦柳线枝城长江特大桥常规检定评估试验[R].武汉,2011.
  • 8王玉荣.高层建筑物钢结构吊装施工要点[J].科学之友,2012(16):32.
  • 9李森平.东海大桥墩台钢管桩施工技术[J].水运工程,2009(8):163-168. 被引量:1
  • 10罗尧治,王小波,杨鹏程,童若飞,沈雁彬.某钢结构廊桥施工吊装过程监测[J].施工技术,2010,39(2):10-13. 被引量:11

共引文献40

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部