湖东二级泵站基坑降水方案设计

Foundation pit dewatering design of Hudong 2nd-stage pump station
下载PDF
导出
摘要 论述了安徽省枞阳县湖东二级泵站工程基坑降水的设计思路,利用干扰井群公式对各井出水量进行计算,并对坑内水位降深进行验算;采用分层总和法对坑外沉降量进行计算,评估分析降水对周边建筑物稳定性的影响。该降水方案设计可为类似地质条件的沿江泵站工程降水设计方案提供参考。 A detailed introduction was made on the foundation pit dewatering design of Hudong 2nd-stage pump station at Zongyang County of Anhui Province.The interference well group formula was adopted to calculate the dewatering volume of wells.The water level fall depth in the pit was examined.The settlement outside the pit was calculated by stratified summation method to analyze the influence of dewatering on the stability of surrounding buildings.
作者 白柯含 BAI Ke-han(Anhui Survey&Design Institute of Water Resources&Hydropower Co.,Ltd,Hefei 230088,China)
出处 《广西水利水电》 2020年第3期61-63,86,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 深井降水 干扰井群 沉降计算 湖东二级泵站 Deep well dewatering interference well group settlement calculation Hudong 2nd-stage pump station
  • 相关文献

参考文献1

二级参考文献3

  • 1北京地质学院水文地质及工程地质教研室.普通水文地质学[M].北京:地质出版社,1960.85-86.
  • 2北京地质学院水文地质教研室.地下水动力学[M].北京:中国工业出版社,1961.85-86.
  • 3黄志仑.关于地下建筑物的地下水扬力问题分析[J].岩土工程技术,2002,16(5):273-274. 被引量:43

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部