期刊文献+

生产全外委模式下大南湖二号露天矿安全生产管理 被引量:4

Safety production management under production outsourcing mode in Dananhu No.2 Open-pit Mine
下载PDF
导出
摘要 大南湖二号露天煤矿采剥工程及生产系统运营均采用外委承包模式,极大降低了初期投资成本和生产运营成本。结合大南湖二矿近几年来的管理现状,通过分析煤矿外委承包单位出现的各种问题,查找原因,总结管理经验,提出针对性地管理措施和对策。 The stripping project and production system operatio in Dananhu No.2 Open-pit Coal Mine adopts the outsourcing contracting mode,which greatly reduces the initial investment cost and production operation cost.Combining with the management situation in Dananhu No.2 Coal Mine,through analyzing the various problems of outsourcing contractors of coal mines,finding out the reasons,summarizing the management experience,the article puts forward targeted management measures and countermeasures.
作者 姜宁 JIANG Ning(Shenhua Guoshen Group Dananhu No.2 Mine,Hami 839000,China)
出处 《露天采矿技术》 CAS 2020年第3期122-124,共3页 Opencast Mining Technology
关键词 露天煤矿 全外委承包 安全生产 管理经验 建议措施 open-pit coal mine all outsourcing safety production management experience suggestion measure
  • 相关文献

参考文献6

二级参考文献19

共引文献22

同被引文献18

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部