期刊文献+

保留巷道强矿压显现机理及其防治技术研究 被引量:2

Study of strong rock pressure appearance mechanism and control technique in retain roadway
下载PDF
导出
摘要 针对布尔台煤矿42106工作面回采期间其辅运巷道(42105工作面保留巷道)超前段出现的强矿压显现,通过理论分析确定其发生机理,即受地质条件、采动影响以及巷道布置等多因素影响。在此基础上,为保证同等生产条件的42107工作面回采期间巷道正常使用,提出并实施顶板水压致裂技术,同时在42108辅运、42107辅运及42107主运对42107工作面实施定向水压致裂,实现围岩高应力的转移。实践证明,通过定向水压致裂技术大大降低了巷道超前支护段的矿压显现强度,保证了工作面的正常生产。 Aiming at the strong ore pressure in the advanced section of auxiliary transport roadway during mining of the working face 42206 in Buertai coal mine.The mechanism is determined by theoretical analysis,which strong ore pressure is affected by geological conditions,mining and roadway layout.On this basis,in order to ensure the normal use of roadway during mining of the working face 42107 that have the same production conditions with 42106,the roof hydraulic fracturing technology is put forward and implemented.Directional hydraulic fracturing is carried out on 42107 working face in 42108 auxiliary roadway and 42107 auxiliary roadway lead to the high stress transfer of surrounding rock realized.Practice has proved that the directional hydraulic fracturing technology can greatly reduce the apparent strength of strong mine pressure in the advanced supporting section of roadway.
作者 高亮 訾杨 GAO Liang;ZI Yang(Buertai Coal Mine,Shenhua Shendong Coal Group Corporation Limited,Ordos 017209,China;School of Energy and Mining Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China)
出处 《中国矿业》 北大核心 2020年第S01期460-464,共5页 China Mining Magazine
关键词 巷道强矿压 应力转移 水压致裂 roadway strong pressure stress transfer hydraulic fracturing
  • 相关文献

参考文献11

二级参考文献85

共引文献520

同被引文献26

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部