应用于聚氨酯固化道床施工的烘干车控制系统设计研究 被引量:1

Design Research of Control System of Drying Car Used in Construction of Polyurethane Curing Ballast Bed
下载PDF
导出
摘要 为提高聚氨酯固化道床烘干作业的自动化程度,本文提出一套烘干车控制系统,介绍其设计方案并进行现场测试。该系统以可编程逻辑控制器(PLC)模块为控制核心,通过烘干冷却设备、密封装置、走行模块、检测设备等实现对聚氨酯固化道床的自动烘干冷却,并通过显示屏直观地监测车上各限位气缸的状态。现场测试结果表明:烘干效果与烘干时间、烘干温度有关;选用烘干13 min+冷却8 min方案能够高效地对聚氨酯固化道床进行烘干;该系统具备可行性和可靠性。 In order to improve the automation of drying operation of polyurethane curing ballast bed,this paper presented a set of control system of drying car,introduced its design scheme and carried out field test.The system takes programmable logic controller(PLC)module as the control core,realizes the automatic drying and cooling of polyurethane curing ballast bed through drying and cooling equipment,sealing device,running module,testing equipment,etc.,and directly monitors the status of each limit cylinder on the vehicle through the display screen.Field test results show that drying effect is related to drying time and temperature,and the scheme of drying for 13 min+cooling for 8 min can effectively dry the polyurethane curing ballast bed.The system has feasibility and reliability.
作者 马时雨 周佳亮 高春雷 MA Shiyu;ZHOU Jialiang;GAO Chunlei(Postgraduate Department,China Academy of Railway Sciences,Beijing 100081,China;Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China)
出处 《铁道建筑》 北大核心 2020年第6期148-150,154,共4页 Railway Engineering
关键词 铁路路基 聚氨酯固化道床 道床烘干 现场试验 控制系统 PLC 监控系统 railway subgrade polyurethane curing ballast bed ballast bed drying field test control system programmable logic controller(PLC) monitoring system
  • 相关文献

参考文献5

二级参考文献15

共引文献14

同被引文献17

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部