期刊文献+

矸石充填开采沿充留巷围岩控制技术研究 被引量:11

Study on Surrounding Rock Control Technology of Gob-side Retaining Roadway in Gangue Filling Mining
下载PDF
导出
摘要 对沿充留巷进行了定义,并与沿空留巷进行了对比分析。采用UDEC离散元数值计算软件对矸石充填留巷覆岩结构及移动规律进行了分析。数值结果显示:相比于垮落法沿空留巷技术,充填开采沿空留巷工作面采空区上覆岩层结构形态以完整层状岩层为主,巷旁支护体与充填体共同承担荷载,开采扰动对沿充留巷围岩变形破坏影响小。以葫芦素煤矿为工程背景,针对矸石充填沿空留巷技术特点,以巷旁支护、临时挡矸和巷内联合支护3个方面提出了围岩控制方案,确保沿空巷道的稳定性,对后续类似工程具有重要参考价值。 The retaining roadway along filling is defined and compared with the retaining roadway along goaf.UDEC discrete element numerical calculation software was used to analyze the overburden structure and movement law of waste filling retaining roadway.The numerical results show that compared with the technology of gob-side entry retaining by caving method,the structure of overlying strata in gob-side entry retaining face in backfilling mining is dominated by intact layered strata.The supporting body and filling body at roadside bear the load together.The mining disturbance has little influence on the deformation and failure of surrounding rock along the gob-side entry.Based on the engineering background of Hulusu coal mine,aiming at the technical characteristics of gob-side entry retaining with waste filling,the surrounding rock control scheme is put forward from three aspects of roadside support,temporary gangue retaining and unite support in roadway to ensure the stability of gob-side roadway,which has important reference value for the follow-up similar projects.
作者 郑忠友 吴玉意 朱磊 黄剑斌 ZHENG Zhong-you;WU Yu-yi;ZHU Lei;HUANG Jian-bin(China Coal Energy Research Institute Co.,Ltd.,Xi'an 710054,China)
出处 《煤炭技术》 CAS 2020年第6期19-23,共5页 Coal Technology
关键词 沿空留巷 充填开采 数值模拟 围岩控制 gob side entry retaining backfill mining numerical simulation surrounding rock control
  • 相关文献

参考文献8

二级参考文献66

共引文献584

同被引文献101

引证文献11

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部