污水处理厂不停水施工设备安装探讨 被引量:2

Discussion on Installation of Non-stop Construction Equipment in Sewage Treatment Plant
下载PDF
导出
摘要 在污水处理厂提升改造项目中,特别是老旧污水处理厂进行提标改造中,设备更新和安装是非常重要的,它关系到污水处理厂提标改造的各项指标是否达到标准。结合具体污水处理厂不停水施工实例,简要探讨污水处理厂不停水施工中设备安装过程,主要包括:更换微孔曝气系统、曝气系统倾斜度测量、金刚石绳锯切割开洞、安装拦截筛网、推流器安装等工序,希望能对类似工程起到帮助。 In the upgrading and reconstruction projects of sewage treatment plants,especially the upgrading of old sewage treatment plants,equipment renewal and installation are very important.It is related to whether the indicators of the sewage treatment upgraded meet the standards.In this article,the author briefly discusses the equipment installation process in the non-stop water construction of the sewage treatment plant,including:replacement of the microporous aeration system,inclination measurement of the aeration system,and diamond wire saw cutting and opening,installation of intercepting screens,installation of flow pushers and other processes,hoping to help similar projects.
作者 张豪 ZHANG Hao(Fourth Engineering Co.Ltd.,18th Bureau Group,China Railway Tianjin 3000350)
出处 《河北建筑工程学院学报》 CAS 2020年第1期85-90,共6页 Journal of Hebei Institute of Architecture and Civil Engineering
关键词 不停水施工 微孔曝气系统 倾斜度测量 拦截筛网安装 推流器安装 non-stop water construction microporous aeration system inclination measurement interception screen installation flow locator installation
  • 相关文献

参考文献3

二级参考文献5

共引文献51

同被引文献18

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部