3Imai, A. , Nishimura, E. , Papadimitriou, S.. The dynamic berth allocation problem for a container port[J]. Transportation Re- search Part B,2001,35(4) :401-417.
4Imai, A. ,Nagaiwa,K. ,Tat,C. W.. Efficient planning of berth al- location for container terminals in Asia[J]. Journal of Advanced Transportation, 1997,31 (1) : 75-94.
6Liu,J. , Wan, Y. W. , Wang, L.. Quay crane scheduling at contain- er terminals to minimize the maximum relative tardiness of vessel departures[J].Naval Research Logistics,2006,53(1):60-74.