摘要 以上海市宝山区张华浜东排水泵站和调蓄池的设计为例,针对泵站在进水条件较差、泵站位置狭小且不规则、雨水出水口位置受岸线码头阻挡等复杂地块条件下的不利因素进行了优化设计。提出了计算流体力学(CFD)进水流态模拟的优化分析、泵房与调蓄池合建式叠加布置的优化措施,并通过数模分析对穿越已建码头的出水口水流扩散参数进行了最低环境扰动的优化选择。 Taking the design of Zhanghuabang East drainage pump station and storage tank in Baoshan District of Shanghai as an example,the design was optimized under complex land parcel conditions of poor inlet,narrow and irregular location,and the blocked stormwater outlet by waterfront wharf.The optimal analysis of inflow pattern simulation by computational fluid dynamics(CFD)and the optimal joint construction measures of pump house and the storage tank up and down were proposed.The optimal selection of the minimum environmental disturbance for the outlet flow diffusion parameters crossing the existing wharf was carried out by means of the numerical modeling analysis.
作者 郁片红 YU Pian-hong(Shanghai Urban Construction Design and Research Institute<Group>Co.Ltd.,Shanghai 200125,China)
出处 《中国给水排水》 CAS CSCD 北大核心 2020年第10期89-94,共6页 China Water & Wastewater
关键词 排水泵站 初期雨水调蓄池 优化设计 复杂地块条件 计算流体力学(CFD) drainage pump station initial stormwater storage tank optimal design complex land parcel conditions computational fluid dynamics(CFD)
  • 相关文献

参考文献2

二级参考文献1

共引文献22

同被引文献24

引证文献8

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部