期刊文献+

考虑设备劣化及返工的质量批量模型研究 被引量:2

A Study of the Quality Batch Model Considering Equipment Degradation and Rework
下载PDF
导出
摘要 为了得到最大质量批量,研究了返工成本边际效应下的期望利润值计算方法,将生产过程分为两个阶段:无需返工和需要返工的连续加工。给出了质量控制策略下批量计算公式以及考虑边际成本下的最大利润所对应的质量批量。采用蒙特卡洛仿真和Design Expert 8.0.6软件拟合,通过数字实验,对比了返工成本与未考虑返工成本情况下的期望利润值。研究显示,考虑返工成本边际效应下的质量批量大于一般的经济批量,所得到期望利润也最大。 In order to get the maximum quality batch,the calculation method of expected profit value is studied under the marginal effect of rework cost.The production process is divided into two stages in which one is continuous processing without rework and the other is continuous processing requiring rework.The batch calculation formula under the quality control strategy and the quality batch corresponding to the maximum profit under the marginal cost are given.Monte Carlo simulation and Design Expert 8.0.6 software are used to work out the result.The expected profit value of rework cost is compared with that of no rework cost.Through the digital experiment,the research shows that the quality lot size considering the marginal effect of rework cost is larger than the general economic lot size,and the expected profit at maturity is also the largest.
作者 方叶祥 王洪冬 钱庆 樊树海 FANG Yexiang;WANG Hongdong;QIAN Qing;FAN Shuhai(School of Economics and Management,Nanjing Tech University,Nanjing 211816,China)
出处 《工业工程》 北大核心 2020年第3期59-64,74,共7页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(71671089) 江苏省社会科学基金资助项目(15GLB020) 江苏省高校社会科学重点基金资助项目(2017ZDIXM075)。
关键词 生产批量 返工 响应曲面法 期望利润 production batch rework response surface method expected profit
  • 相关文献

参考文献11

二级参考文献67

  • 1刘三,蒋祖华.设备管理及监控的应用案例分析[J].工业工程与管理,2004(S1):84-91. 被引量:4
  • 2涂忆柳,李晓东.维修工程管理研究与发展综述[J].工业工程与管理,2004,9(4):7-12. 被引量:30
  • 3侯文瑞,毛建伟,蒋祖华.设备管理及维护信息系统的开发与应用[J].工业工程与管理,2004,9(4):53-57. 被引量:23
  • 4程志君,郭波.基于半Markov决策过程的劣化系统检测与维修优化模型[J].自动化学报,2007,33(10):1101-1104. 被引量:10
  • 5Pinedo M L. Scheduling: Theory, algorithms, and systems[M]. New York: Springer, 2012: 13-40.
  • 6Adiri I, Bruno J, Frostig E, et al. Single machine flow-time scheduling with a single breakdown[J]. Acta Informatica, 1989, 26(7): 679-696.
  • 7Lee C Y, Leon V J. Machine scheduling with a rate-modifying activity[J]. European J of Operational Research, 2001, 128(1): 119-128.
  • 8Liao C J, Chen W J. Single-machine scheduling with periodic maintenance and nonresumable jobs[J]. Computers & Operations Research, 2003, 30(9): 1335-1347.
  • 9Chen W J. Minimizing total flow time in the single-machine scheduling problem with periodic maintenance[J]. J of the Operational Research Society, 2006, 57(4): 410-415.
  • 10Hsu C J, Low C, Su C T. A single-machine scheduling problem with maintenance activities to minimize makespan[J]. Applied Mathematics and Computation, 2010, 215(11): 3929-3935.

共引文献85

同被引文献16

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部