期刊文献+

呼和浩特市轨道交通1、2号线一期工程BIM全生命期应用研究 被引量:7

Study on Life-Cycle BIM Application in Engineering Phase 1 of Rail Transit Line 1 and Line 2 Project in Hohhot
下载PDF
导出
摘要 呼和浩特市轨道交通1、2号线一期工程是全国首个以全投资PPP模式运作的轨道交通项目,BIM技术作为信息化管理的重要手段。本文从BIM全生命期应用出发,详细介绍了城市轨道交通BIM全周期应用体系包括:BIM应用标准、BIM数据集成与管理平台、工程各阶段BIM应用、数字化资产移交,形成一套BIM全生命期应用方法,为城市轨道交通数字化建设提供指导思路。 The engineering Phase 1 of the rail transit Line 1 and Line 2 project in Hohhot is the very first rail transit project in China operated under the full-investment PPP mode in China,which considers the BIM technology as one of major means to implement informatized management.From the life-cycle application of BIM,this paper introduces the life-cycle BIM application system in details,including:the BIM application standard,the BIM data integration and management platform,the BIM application in all different stages of the project,and the digital asset delivery.Hence,a full set of life-cycle BIM application method is formed,providing guidance for the digital construction of urban rail transit.
作者 刘占英 张振义 王辉 麻永华 董桂林 Liu Zhanying;Zhang Zhenyi;Wang Hui;Ma Yonghua;Dong Guilin(Hohhot Urban Rail Transit Construction Management Co.,Ltd.,Hohhot 010020,China;Beijing Rail Transit Design&Research Institute Co.,Ltd.,Beijing 100068,China)
出处 《土木建筑工程信息技术》 2020年第3期120-127,共8页 Journal of Information Technology in Civil Engineering and Architecture
基金 呼市轨道交通1、2号线一期工程BIM数据集成全生命周期研究及应用(编号:HHDTKY20190008)。
关键词 BIM技术 城市轨道交通 全生命期 BIM数据集成与管理平台 BIM Technology Urban Rail Transit Whole Life-Cycle BIM Data Integration and Management Platform
  • 相关文献

参考文献10

二级参考文献52

  • 1邓雪原.CAD、BIM与协同研究[J].土木建筑工程信息技术,2013,5(5):20-25. 被引量:59
  • 2李珂.竣工结算审核质量与造价控制[J].建筑经济,2007,28(4):76-78. 被引量:36
  • 3卞伟.谈现代城市轨道交通的设备管理分类及编码[J].科技信息,2007(22):290-292. 被引量:4
  • 4牟蒋.四维建筑信息模型技术研究[D].北京:北京林业大学,2009.
  • 5Williams G, Gheisari M, Chen P J, et al. BIM2MAR : an efficient BIM translation to mobile augmented reality applications [ J]. Journal of Management in Engineer- ing, 2014,31 ( 1 ) : A4014009-1 -A4014009-8.
  • 6Mignard C,Nicolle C. Merging BIM and GIS using on- tologies application to urban facility management in ac- tive3D[ J ]. Computers in Indust~, 2014, 65 ( 9 ) : 1276-1290.
  • 7Dong M,Neukum C, Hu H,et al. Real 3D geoteehni- cal modeling in engineering geology:a case study from the inner city of Aachen, Germany [ J 1- Bulletin of Engineering Geology and the Environment,2014, ( 7 ) : 1-20.
  • 8Burcin B G, Karen K. Buihting information modeling in architecture, engineering and construction :emerging research directions and trends [ J]. Jnurnal of Profes- sional Issues in Engineering Education and Practice, 2010,136 ( 3 ) : 139-147.
  • 9上海交通大学BIM研究团队官方网站.http://bim.sjtu.edu.
  • 10EASTMAN, C. General purpose building description systercz [J]. CAD Computer Aided Design, 1976, 8(1): 17-26.

共引文献221

同被引文献37

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部