期刊文献+

某露天矿开拓运输系统优化布置及移设研究 被引量:6

Study of Layout Optimization of Development and Transportation System and Shifting of Crushing Station for an Open-pit Mine
下载PDF
导出
摘要 基于采矿延深速度合理确定矿石半移动破碎站移设步距,通过多方案类比以及全面技术经济比较,并充分考虑了采场由山坡露天阶段向深凹露天阶段过渡时,深部胶带工艺布置与前期地表胶带的衔接,合理确定了矿石半移动破碎站-胶带机开拓运输系统的最佳工艺布置方式,实现了前期供矿胶带的充分利用,节省了投资。 Based on mining extension rate,moving increment of semi-mobile crushing station is reasonably determined.Through multi-scheme analogy and comprehensive technical and economic comparison,with the connection between the process layout of deep rubber belt and the previous surface rubber belt during the stope transition from the open stage of hillside to the open stage of deep depression fully considered,the optimal process layout of the ore semi-mobile crushing station-belt conveyor development transportation system is reasonably determined,which realizes the full utilization of early-stage ore-supply belt conveyors and saves environment.
作者 王斌 白俊 臧龙 WANG Bin;BAI Jun;ZANG Long(Tisco group LanXian county mining Co.Ltd.,Lvliang 033504,China)
出处 《矿业工程》 CAS 2020年第2期21-25,共5页 Mining Engineering
关键词 开拓运输系统 半移动破碎站 工艺布置 移设步距 development&haulage system semi-mobile crushing station process arrangement moving increment
  • 相关文献

参考文献4

二级参考文献5

共引文献7

同被引文献57

引证文献6

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部