摘要
依据国际EPC总承包项目在实施过程中不同阶段所呈现出的不同特点,结合工程实例,探讨了国际EPC总承包项目在投标报价、合同谈判及签订、设计、采购、施工、竣工等不同阶段费用控制的主要内容。
According to the different characteristics of international EPC project presented in different stages of project execution,and taking the engineering projects as examples,this paper discusses the main contents of cost control in different stages of international EPC project,such as bid price,contract negotiation and signing,design,procurement,construction,completion,etc.
作者
彭勇
PENG Yong(China Nerin Engineering Co.,Ltd.,Nanchang,Jiangxi 330038,China)
出处
《有色冶金设计与研究》
2020年第3期51-53,共3页
Nonferrous Metals Engineering & Research