文章对火力发电厂汽轮机的安装进行了详细的介绍,并且对当前汽轮机安装中的问题进行了详细的描述,并结合实际情况提出了可行的汽轮机安装技术性改造方案.
In this paper,the installation of steam turbine in thermal power plant is introduced in detail,and the current problems in the installation of steam turbine are described in detail.At the end of this paper,combined with the actual situation,a feasible technical transformation scheme for the installation of steam turbine is proposed.
出处
《电力系统装备》
2020年第10期55-56,共2页
Electric Power System Equipment
关键词
电厂
汽轮机
现场安装
技术改造方案
power plant
steam turbine
fi eld installation
technical transformation plan